Studio
Apartment

Studio Apartment - Phase 1

Construction of  Studios  in Phase 1  started from January 2023 to December  2024. The apartment has a plinth area of 39 Sq Meters. currently 80 % Sold Out.

Payment Plan [ Studio Apartment - Phase 1 ]

80 % Sold Out

SIZE M2UNITSPRICE30% DEPOSIT40% DEPOSIT50% DEPOSIT60% DEPOSIT70% DEPOSIT80% DEPOSIT90% DEPOSIT100% DEPOSIT
47804.7 M4.6 M4.5 M4.4 M4.3 M4.2 M4.1 M4.0 M3.9 M

Studio Apartment - Phase 2

Construction of  Studios in Phase 2 will start from June 2024 to September  2026. The apartment has a plinth area of 49 Sq Meters, Currently 40 % Sold Out.

Payment Plan [ Studio Apartment - Phase 2 ]

40 % Sold Out

SIZE M2UNITSPRICE30% DEPOSIT50% DEPOSIT70% DEPOSIT100% DEPOSIT
49114.5 M4.4 M4.1 M3.9 M3.7 M